Porch Concrete is a construction, which is adjacent to the entrance to the house and looks like a small veranda.The design of the present steps, railings and an extra decoration material.You can build this building, using wooden beams, but they are considerably concede in strength and durability of such material, like concrete.Of course, the concrete structure has its drawbacks in terms of higher costs of resources and energy.However, you can save on construction, if the installation work to make their own hands.
During the construction of the porch of the concrete should pay attention to its size they should be in harmony with the overall dimensions of the house.Furnish of buildings should be made from materials similar decoration of the facade of the house.
After the design components of the porch have been identified, it is necessary to calculate building materials that will be needed during construction.This calculation includes the total amount plus the amount of the porch steps.It is best to preliminary calculations performed on the scaled drawing.If you plan to use in the work finished concrete blocks, it is easy enough to calculate the total volume of construction.But in the case when the concrete is planned to mix in place, it should calculate the amount of building materials on the basis of the following indicators: per cubic meter of concrete is necessary:
This takes into account that for each stage you must use two rod reinforcement.
important aspect of the work is to determine the shape of steps.From that, how large are these elements concrete porch may depend on ease of use of the assembly.The most convenient for walking are broad steps.They may also be located in the middle of its structure or to the sides.If the steps planned to build more than three, you should consider the railing device.
formwork Production made of boards or plywood sheets.In height, it should be slightly larger than the porch, as will be buried under the ground about 30 centimeters.
reinforcement Before starting the process you need to pave the sand bottom of the roofing material.Then you can begin to strengthen the structure by means of reinforcement.On average it takes about a porch 150-170 meters.With insufficient reinforcement could occur undermining the structure and the appearance of cracks.
solution After the reinforcing mesh is assembled, you can begin the process of pouring concrete.It should be watered constantly placed in the concrete formwork with water so that it fills all the cracks.Also, the solution is filled with ramming tool-ram.
concrete After the concrete has been poured, you must allow it to dry for at least 4-5 days.However, this is not the limiting time.In order to pouring concrete has gained maximum strength, it is necessary to infuse for 28 days.
After the concrete has stiffened, it is necessary to make a decorative trim.It is usually chosen to match the building's facade.Facing materials worth taking, given the steps that may be exposed to the weather.